Estimating specifications

When accurately estimating how long it would take me write a specification I always end up with the same estimate: zero time. This is because the more accurate the estimate the more specified must be that which I'm estimating. So when the estimate reaches complete accuracy the specification reaches complete completion (so to speak)

So there is nothing left to do.

To avoid this problem I now give inaccurate estimates.